AVTUR PIPELINE TANJUNG PERAK - JUANDA | SURABAYA ( PERAK - JUANDA ) | 20 Month after contract signed | PT PERTAMINA ( Persero ) | EPC Basis | USD. 8 Million | Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) | |
2 | TERMINAL LPG - PRESSURIZED | PT. PERTAMINA (Persero) | PESANGGARAN - DENPASAR | 20 Month after contract signed | EPC Basis | USD. 11.3 Million | Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) | |
3 | REVITALISASI PABRIK GULA | KEMENTERIAN PERINDUSTRIAN | PTP NUSANTARA X DAN XI | 3 Month after signing contract | EPC Basis | USD, 9 Million | Procurement, Fabrication, Instalation of Various Component | |
4 | RELOKASI DPPU - SELAPARANG | PT. PERTAMINA ( Persero ) | LOMBOK BARAT - NTB | 12 Month | EPC | USD 5 Million | Procurement, Fabrication, Instalation, Test | |
5 | RELOKASI DPPU - HASANUDIN | PT REKAYASA INDUSTRI | BANDARA HASANUDIN - MAKASSAR | 9 Month after signing contract | MANUFACTURING | USD 1.1 Million | Procurement, Fabrication, Instalation | |
6 | SPHERE TANK - JAMBI MERANG | JOB PERTAMINA - TALISMAN | JAMBI | 6 Month after signing contract | MANUFACTURING BASIS | USD 1.5 Million | Procurement, Fabrication, Instalation SPHERICAL TANK | |
7 | LOWER SOLO | PPSDA BENGAWAN SOLO | BOJONEGORO - JATIM | 45 Month after signing contract | EPC Basis | USD 5.8 Million | Hydro Mechanical, Electrical & Control System ( Procurement, Fabrication, Instalation, Test ) PINTU AIR BENDUNG | |
8 | PLTM WALESSI | PT PLN ( Persero ) | PAPUA | 8 Month after signing contract | MANUFACTURING BASIS | USD 1.1 Million | Procurement, Fabrication, Instalation TURBIN AIR | |
9 | PEMBUATAN GUDANG | PT KBS | CILEGON | 5 Month after signing contract | CONSTRUCTION BASIS | USD 2.5 Million | Procurement, Fabrication, Instalation | |
10 | TRUCK FRAME | GE OPERATION IND. | INDONESIA | 4 Month after signing contract | MANUFACTURING BASIS | USD 1.1 Million | Procurement, Casting, Fabrication, Assembling TRUCK FRAME | |
11 | KILN SHELL | PT SEMEN GRESIK, In | TUBAN - JAWA TIMUR | 4 Month after signing contract | MANUFACTURING | USD. 1.4 Million | Procurement, Fabrication, Transportation, Instalation KILN SHELL | |
12 | SEMEN TUBAN | PT SEMEN GRESIK | TUBAN - JAWA TIMUR | 4 Month after signing contract | MANUFACTURING BASIS | USD, 7.4 Million | Fabr Mill Body, Clasifier, Preheater, Mechanical Kiln, PWHT Uper-lower Drum | |
13 | SPHERICAL TANK | JOB PERTAMINA - TALISMAN | JAMBI | 6 Month after signing contract | MANUFACTURING BASIS | USD, 1.9 Million | Procurement, Fabrication, Erection SPHERICAL TANK | |
14 | MUD TANK | PERTAMINA PDSI JAKARTA | JAWA TENGAH | 4 Month after signing contract | MANUFACTURING BASIS | USD, 3.2 Million | Proc, Fabrication, Installation MUD TANK | |
15 | PINTU AIR | BALAI BESAR W S | SERAYU, CIMANUK | 4 Month after signing contract | MANUFACTURING BASIS | USD. 1.95 Million | Proc, Fabrication, Instalation PINTU AIR BENDUNG DAN IRIGASI | |
16 | Pembangunan Pabrik Kelapa Sawit | PT Perkebunan Nusantara VI - Jambi | Solok Selatan | 14 after Contrack | EPC Basis | USD. 5 Million | Engineering, Procurement, Construction & Comissioning | |
17 | Komponen Bogie PPCW | PT INKA | Madiun - Jawa Timur | 36 month | Manufacturing basis | 8.9 Million USD | Casting, Machining | |
18 | Bogie S-2E CBH 965 WINGLESS | Standard Car Truck | Jakarta | 7 Month after signing contrack | Manufacturing basis | USD 2.5 Million | Casting, Machining | |
19 | Fabrikasi HPH | PT Pembangkit Jawa Bali ( PJB ) | Mojokerto Jatim | 14 Month after signing contrack | Manufacturing basis | USD 5.4 Million | Procurement, Fabrication, Instalation | |
20 | Bagasse Dryer | PT RNI | | 3 Month after signing contrack | EPC Basis | USD 3.1 Million | Design, Matl Proc.Fabrication & Instalations |